JADUAL PURATA KADAR HARGA 2011
     

BAHAGIAN

PERKARA


1.0

Pendahuluan Dan Panduan Penggunaan
   

2.0

Kos Kerja-Kerja Am (General Items)
  2.1

Peratusan Kos Kerja Am Daripada Harga Tender (Tidak Termasuk Jumlah Kos Kerja Am)

     
  2.2

Peratusan Kos Kerja Am (General Items) ke Atas Kos Kerja Pembina - Mengikut Butiran Terperinci

   

3.0

Kos Item-item Kerja
   
  3.1 Environmental Protection and Enhancement
  3.2 Demolition & Site Clearance
  3.3 Earthworks
  3.4 Geotechnical Works
  3.5 Piling Works
  3.6 Concrete Works
  3.7 Brickwork, Blockwork and Masonry
  3.8 Metalwork
  3.9 Building Works
  3.10 Painting Works
  3.11 Pipeworks
  3.12 Drainage Works
  3.13 Roads & Paving
  3.14 Miscellaneous Works
   

4.0

Kos Upah Buruh
  4.1 Daywork Rates (Buruh)
   

5.0

Kos Sewa Loji/Jentera
  5.1 Daywork Rates (Jentera)
   
     

DISEDIAKAN OLEH
BAHAGIAN UKUR BAHAN DAN PENGURUSAN KONTRAK
JABATAN PENGAIRAN DAN SALIRAN MALAYSIA

Sebarang ulasan/cadangan adalah dialu-alukan sila hubungi
Pn. Rohimah Bt. Yusof (03-2697 2624) & Pn. Nor Azlida Bt. Abd. Rahim (03-2697 2619)
Dilayarkan  : 2001 (Versi 1)
Dikemaskini : Disember 2011