JADUAL PURATA KADAR HARGA 2013
       
BAHAGIAN

PERKARA

MUKASURAT

1.0

Pendahuluan Dan Panduan Penggunaan

1 - 3

     

2.0

Kos Kerja-Kerja Am (General Items)

4
 
2.1

Peratusan Kos Keseluruhan Kerja Am Daripada Kos Kerja Pembina (Tidak Termasuk Jumlah Kos Kerja Am, Wang Peruntukan Sementara & Wang Kos Prima)

5

 
 
 
2.2
Peratusan Kos Terperinci Kerja Am (General Items) Daripada Kos Kerja Pembina (Tidak Termasuk Jumlah Kos Kerja Am, Wang Peruntukan Sementara & Wang Kos Prima)

6 - 7

     

3.0

Kos Item-Item Kerja

8
     

 
3.1
Environmental Protection and Enhancement
9
 
3.2
Site Investigation Works
10
 
3.3
Demolition & Site Clearance
11 - 12
 
3.4
Earthworks
13 - 17
 
3.5
Geotechnical Works
18 - 21
 
3.6
Piling Works
22 - 25
 
3.7
Concrete Works
26 - 29
 
3.8
Brickwork, Blockwork and Masonry
30
 
3.9
Timber Work
31
 
3.10
Metalwork
32
 
3.11
Building Works
33 - 35
 
3.12
Painting Works
36
 
3.13
Pipeworks
37
 
3.14
Drainage Works
38 - 42
 
3.15
Roads & Paving
43 - 45
 
3.16
Miscellaneous Works
46 - 47
     

4.0

Kos Upah Buruh

48 - 49
    Day Work Rates (Buruh)

5.0

Kos Sewa Loji/Jentera

50 - 52
    Day Work Rates (Jentera)
     
       

DISEDIAKAN OLEH
BAHAGIAN UKUR BAHAN DAN PENGURUSAN KONTRAK
JABATAN PENGAIRAN DAN SALIRAN MALAYSIA

Sebarang ulasan/cadangan adalah dialu-alukan sila hubungi
Pn. Nor Hasni Bt Muhd. Supian (03-2616 1419) & Pn. Norzamzarina Bt Abdul Rashid (03-2616 1431)
Dikemaskini : Januari 2014